Our Services
We Are Ready To Provide The Best Service To Meet Your Needs. Trust Us To Deliver A Satisfying Experience And Reliable Solutions. Your Satisfaction Is Our Top Priority.
OUR BUSSINESS SERVICES
why choose our services
"Yeongheung Power Plant – Coal Upgrading Facility Capacity: Enhances Coal 3,000 Tons/Day with 3 Trains Dewatering: From 30% to 15% (Reduces Surrounding Moisture by Approximately 15%)"
01
LOW-COAL UPGRADING SYSTEM
High and Low Calorific Water Content Coal Upgrade System
To Be Low Cal Coal Sample From 43% Water/3,452 Kcal/Kg, Upgraded To 5% Water/5,613 Kcal/Kg Coal
High Water Content Sub-Bituminous Coal Is Preferred
Production Capacity 1,000 T/D With 2 Train System
Crushing → Dewatering → Drying → Moulding Process Based on Long-term Experience in the Field of Coal-fired Power Plant in Korea
The mould process is to prevent it from reabsorbing and contaminating during handling and subsequent transportation.
02
ADVANTAGES OFFERED BY THE KOREAN SYSTEM
Improved drying capability
Simplified coal upgrading system, with reduced auxiliary tools, makes it possible to prevent problem issues
Low power and heat consumption
Smaller amount of CAPEX and OPEX
We at PT Buto focus on friendly and reliable service for onshore or offshore needs. A good relationship with our customers is our priority. Here are the featured services we provide:
- Underwater Inspection
- Salvage Operations
- Marine Construction
- Pipe & Cable Laying
- Cathodic Protection (onshore & offshore, including materials and installation)
- CIPS and DCVG surveys for pipelines
- Electrical, Mechanical and Electronic Installations (both onshore and offshore)
- Lightning Protection Systems
- Chemical Cleaning and Passivation of Tanks, Cooling Towers, Boilers
Feel free to contact us for your needs, we are ready to help!